6CNC · Inspection and process control

Quality Control
from Drawing to Delivery

6CNC connects design review, material verification, in-process checks, and final inspection to the requirements of your part. Critical features and reporting needs are agreed before production.

6cnc Company Testing Laboratory
ZEISS CMM inspection room at 6CNC.
  • First article inspection
  • In-process checks
  • Final verification

Quality Checks at the Stages That Matter

Inspection works best when it follows a clear part definition. 6CNC reviews the drawing, material, critical dimensions, and finishing requirements before manufacture and checks parts during production.

01

Drawing review

Identify tight tolerances, complex geometry, and difficult-to-machine features

02

Material control

Verify the specified material and maintain the agreed traceability

03

First article inspection

Review the initial manufactured part against the agreed requirements

04

In-process checks

Detect deviations during machining so corrections can be made early

05

Final inspection

Verify the finished condition and agreed acceptance requirements

Match the Measurement to the Feature

6CNC uses inspection equipment to check critical features and dimensional requirements. The inspection method and report scope should match the drawing and the intended acceptance criteria.

Inspection methodTypical purpose
CMM systemsZEISS and Hexagon systems are listed in the existing company information; review complex geometry and datum-based dimensions
Image measurementReview accessible features and the inspection method required by the drawing
Surface roughness measurementDefine the parameter, measurement location, and acceptance requirement
Material analysisSpecify material verification and documentation needs before ordering
Inspection team member checking a manufactured component

Control the Features That Affect Assembly

Material, dimensions, and surface condition need a shared definition. Identify the requirements that affect fit, contact, appearance, and your own verification of the part.

01

Critical dimensions

Existing machining capability is stated as up to ±0.002 mm; actual feasibility depends on material, geometry, and the individual feature

02

Material and traceability

Specify the material grade and the records required for the project

03

Surface and finish

Surface roughness capability of Ra 1.6 μm, subject to material and drawing review; define cosmetic faces, masking, and final dimensions after treatment

04

Repeat batches

Use the approved drawing revision, material, setup requirements, and inspection criteria

Agree the Evidence Before Production

Inspection reports are available. Define the critical characteristics, measurement requirements, and required records in the enquiry so the reporting scope can be included in the quotation.

Reporting scope to define

This checklist is a requirements summary, not an inspection report.

  • Drawing revision and features to be reported
  • Measurement results and acceptance requirements
  • Material documentation and traceability needs
  • Any project-specific reporting format or customer requirement

Certification Documents

Review the certification documents for Shenzhen Sixth CNC Service Co., Ltd. and discuss the scope relevant to your project with 6CNC.

ISO 9001:2015 certificate for Shenzhen Sixth CNC Service Co., Ltd.
ISO 9001:2015 · Quality management system
EN ISO 13485:2016 certificate for Shenzhen Sixth CNC Service Co., Ltd.
EN ISO 13485:2016 · Medical-device quality management system
ISO 14001:2015 certificate for Shenzhen Sixth CNC Service Co., Ltd.
ISO 14001:2015 · Environmental management system

Questions About CNC Quality Assurance

How is the inspection scope defined?

Send the drawing revision, critical features, material, finish, and reporting needs. The scope is agreed for the project.

Does every feature achieve ±0.002 mm?

No. The existing capability statement describes selected work, and feasibility depends on the material, geometry, and feature. Mark the dimensions that need review.

Can you provide inspection reports?

Reports are available. Specify the required characteristics and format in the enquiry so the scope can be confirmed.

How do you support repeat orders?

Keep the approved drawing, material, and inspection requirements consistent, and identify any changes before manufacture.

Can surface finishing change the inspection requirement?

Yes. Define which dimensions and surface checks apply after finishing, including masked and functional faces.

How should I review certification documents?

Open the certificate image and review its holder, standard, and scope. Discuss the documentation required for your supplier qualification with 6CNC.

Project quotation

Start with a Clear Quality Requirement

Send your files and identify the features that matter most. 6CNC will review the manufacturing and inspection requirements together.

Nonferrous & Superalloy Material Guides

Specify material condition, traceability and inspection requirements alongside the controlled drawing.